A specialist cleaning contractor brought Invictus Access in for our glazing expertise. We removed a broken high-level unit on a residential block and installed the new one, working alongside a lightweight tracked crane.

The project

Specialist glazing for a specialist contractor

1High-level unit replaced
2Person IRATA team
SpiderTracked crane
FullContract lift

A specialist cleaning contractor came to Invictus Access for our glazing skills when a high-level glass unit failed on a residential block in Milton Keynes.

Weight restrictions on site ruled out a conventional mobile crane, so the lift was planned around a lightweight tracked spider crane, operated under a full contract lift by a specialist crane team. That kept the load on the ground within limits while still reaching the opening.

Our two-person IRATA team removed the broken unit from the ropes, then guided the new unit into the opening as the crane brought it up, and secured and sealed it in place.

Two IRATA technicians on ropes guiding a new glass unit into a residential tower

How we delivered it

Plan the lift, work the glass

01 PLAN

Choose the crane

Site weight restrictions ruled out a standard mobile crane, so a lightweight tracked spider crane was specified.

02 REMOVE

Out with the broken unit

The failed unit was removed by our IRATA team working on ropes at the opening.

03 LIFT

Contract lift

The crane team lifted the new unit on a vacuum lifter under a full contract lift.

04 INSTALL

From the ropes

Our technicians guided the unit into the opening, then secured and sealed it.