Case study · Heritage redecoration · Central London

Listed building window frames. Painted from the ropes.

External painting of a listed building in central London. Windows prepared, surrounding areas protected and frames painted by our IRATA team, on a site with heavy footfall below.

The project

Heritage redecoration without a scaffold

ListedHeritage building
PreppedEvery frame prepared
ProtectedGlass and stonework masked
CentralLondon, heavy footfall

Invictus Access carried out external painting of the window frames on a listed building in central London.

On a listed building the finish and the protection of the original fabric matter as much as the paint. Each window was prepared first, and the glass and surrounding surfaces were masked and protected before any paint went on.

The building sits in a busy central London location with heavy footfall, so working by rope access kept the street clear of scaffold and the work zone below tightly managed.

Rope access technician painting window frames on a listed building

How we delivered it

Prepare, protect, paint

01 PREPARE

Frames prepped

Each window frame was prepared to give the new paint a sound surface.

02 PROTECT

Mask and protect

Glass, sills and surrounding masonry were masked and protected.

03 PAINT

From the ropes

Frames were painted by our IRATA team working down the elevation.

04 MANAGE

Busy street below

Heavy footfall was managed at ground level throughout the works.