Case study · Internal redecoration

An internal lightwell. Redecorated without a scaffold.

Redecoration of a tall internal lightwell and lift shafts. Rope access was chosen because it cost less than scaffolding the void.

The project

Why ropes instead of scaffold

InternalLightwell and lift shafts
Rope accessInstead of scaffold
LowerCost than scaffolding
RedecoratedFull repaint

A tall internal lightwell and the lift shafts needed redecorating.

Scaffolding an internal void means bringing every tube and board through the building, then losing the space for weeks. Rope access was used because it was the more cost-effective option: our IRATA team rigged from above and painted the walls drop by drop.